Tesla to get over $330 million in tax abatement from Nevada

This post was originally published on this site

Tesla said in January that one of the two new factories will mass produce its long-delayed semi-electric truck, and the other will make its new 4680 battery cell.

The cell plant would be able to make enough batteries for 2 million light-duty vehicles annually, including 4680, which is key to Tesla meeting a goal of halving the manufacturing costs and ramping up battery production nearly 100-fold by 2030.

The Nevada Governor’s Office of Economic Development (GOED) board said on Thursday Tesla is required to create 3,000 jobs at an average hourly wage of $33.49.

The last time Tesla received tax breaks from Nevada was in 2014, when state Governor Brian Sandoval signed a package of bills to provide $1.3 billion in tax abatement and other incentives.